Skip to main content
Have a project in mind? Let's talk
Book a call Tell us about your project Book a Call
Manufacturing ERP

Manufacturing ERP for plants that outgrew spreadsheets Odoo, set up around your floor

One system for bills of materials, production orders, stock, purchasing and costs, so the quote, the shop floor and the books agree. We build it on Odoo Manufacturing, or as custom software when your process needs it, and we tell you which is the better fit.

Bills of materials Work orders Costing Subcontracting
What we build

Five parts of a working plant system.

Every plant is different, so the scope is set after we look at your products. These are the pieces we usually propose for a first phase.

01

Bills of materials and product data

Components, quantities, operations and variants held in one place instead of a recipe workbook. Odoo's documentation covers adding components and operations to a bill of materials, limiting them to product variants, and attaching step-by-step instructions where the Quality app is installed.

ComponentsOperationsVariantsWork instructions
BOM
02

Work orders and work centers

Production orders that split into work orders at the right work centers, with a tablet that controls work orders and tracks time in real time, so the hours are recorded as the job runs, not typed in at the end of the shift.

Work centersDependenciesShop floorTime tracking
Work
03

Stock, purchasing and reordering

Receipts, lots and serial numbers, reordering rules, landed costs and removal by FIFO, LIFO or FEFO, tied to what production actually consumes.

Lots and serialsReorderingLanded costsRemoval rules
Stock
04

Costing and valuation

Manufacturing order costs from components, work center rates and employee time, and a valuation method (standard, average or FIFO) that your accountant has signed off.

MO costReal costStandardFIFO
Cost
05

Custom modules and integrations

Where the standard flow stops: a quoting tool, a supplier portal, a link to your shipping or accounting software, or data import from the systems you are leaving.

Odoo modulesAPI linksData importReports
Custom
Short answer

A manufacturing ERP puts every number about making a product in one place.

If your plant still runs on spreadsheets, a manufacturing ERP replaces the workbook that holds recipes, the one that holds stock counts and the one that holds costs with a single database. A bill of materials drives a production order, the production order drives purchasing and stock, and the finished order drives the cost and the invoice. Nobody retypes anything between steps.

Devvista builds this on Odoo Manufacturing, and as custom software where a process does not fit the standard app. Devvista is a software development company that builds Odoo systems for clients. We work with US companies in US dollars, in plain English, and we start with a call, not a sales deck. If you want a first view of the cost, our Odoo implementation page explains how projects are scoped, and the Odoo pricing guide separates software licences from implementation work.

This page covers what the software does, how costing works, what is specific to the US, when a ready ERP is the better choice, and what a project costs. Where we state a feature of the software, the Odoo documentation page it comes from is listed at the bottom, opened on 9 November 2026.

The problem

Where a plant's numbers stop agreeing.

A quote goes out at one price, purchasing remembers another, and month-end shows a third. The recipe lives in a workbook that one person edits. Stock counts are updated when someone has time. A rush order arrives and nobody can say quickly whether the material is on the shelf or on a purchase order.

This is not a software problem to start with, it is a data problem: the same fact is typed in several places and each copy drifts. An ERP helps because it stores each fact once. It does not help if the product list is full of duplicate part numbers and missing units of measure, which is why every project here begins with data clean-up, not configuration.

A typical starting point: a plant of a few dozen people making configured products to order, quoting from a price list, and keeping recipes, inventory and job tracking in three files. The first goal is rarely a full factory-wide rollout. It is one product family that runs end to end, from quote to production order to invoice, so the team can judge the system on real work.

What the software covers

What Odoo Manufacturing covers, piece by piece.

The table follows the Odoo 19.0 documentation. Items are named as the documentation names them; how each behaves in your plant is confirmed during scoping, on your own products.

PieceWhat the documentation saysSource
Bill of materialsComponents are added line by line and can be limited to product variants. Operations on a bill need the Work Orders setting switched on; detailed step instructions need the Quality app.Bills of materials
Work centers and work ordersThe Manufacturing page lists work centers, work order dependencies, scrap, backorders, by-products, and one-, two- and three-step manufacturing.Manufacturing
Shop floorTablets control work orders in real time, with time tracking for each operation.Manufacturing
Stock and purchasingInventory is described as both an inventory application and a warehouse management system, with lot and serial tracking, reordering rules, landed costs and FIFO, LIFO and FEFO removal.Inventory
ReportingDelays, allocation reports, overall equipment effectiveness (OEE) and production analysis are listed.Manufacturing

Step-by-step instructions on an operation need the Quality app, so if you want them on the tablets we scope that app in as well.

Costing

Costing: standard, average or FIFO, and why the choice matters.

Odoo lets you pick how stock is valued. The three methods, as the valuation cheat sheet describes them:

MethodHow it worksFits when
Standard costA fixed unit cost that you update by hand.Prices are stable and you review costs on a schedule.
Average cost (AVCO)A weighted average of all units; each receipt recalculates it. The documentation's example: 4 units at $16 added to 8 units at $10 gives a unit cost of $12.Purchase prices move and you want cost to follow them.
FIFOUnits leave at the cost of the oldest stock first. In the example, delivering 10 units costs 8 at $10 and 2 at $16.Cost of goods sold should follow the actual purchase order of receipts.

The column on the right is our reading of when each method is a natural candidate, not a rule. Which method suits your books is a decision for you and your accountant, and we configure whatever you choose.

Separate from stock valuation is the cost of a manufacturing order. Per the manufacturing order costs page, Odoo calculates component cost automatically from the average purchase cost, so a cost typed by hand is overwritten by later purchase orders. Work centers and employees carry hourly rates. The MO cost is an estimate built from the bill of materials and its operations; the real cost reflects what happened, and once the order is completed with Produce All, the MO cost column updates to match it.

The practical lesson: a cost report is only as sound as the purchase prices, work center rates and wages you keep current. Part of our job is to set those inputs up so the numbers mean something.

Planning and outside work

Planning ahead and sending a step to an outside shop.

Master production schedule. The MPS plans longer-term replenishment against a demand forecast you can adjust. Odoo says it is most useful for products with long lead times or seasonal demand. It does not create orders by itself: adding a product to the MPS does not raise a purchase or manufacturing order, and reordering rules should not be applied to the same products. A plant with short lead times can leave it off and use reordering rules alone.

Subcontracting. Many plants send coating, plating, cutting or finishing to an outside shop. In the basic subcontracting flow, the bill of materials type is set to Subcontracting and the vendor is named on it. Confirming the purchase order creates a receipt, and when the finished product arrives you validate the receipt to add it to stock. In that basic flow the subcontractor buys its own components. The Manufacturing page also lists resupply and dropship flows, for cases where you supply the material.

US specifics

What is specific to a US plant: sales tax, ACH, checks and 1099s.

Odoo's United States localization page lists several modules a US company may need, and the AvaTax page describes the tax integration. Here is what the documentation says, no more:

  • Sales tax: the AvaTax integration gives real-time, location-specific tax calculation when you sell, purchase and invoice. It is available for companies located in the United States, Canada or Brazil, needs your own Avalara account and license key, uses the company address by default (to use the warehouse address, Odoo says to enable Allow Ship Later in the Point of Sale settings), and does not support excise taxes such as those on tobacco, vapes and fuel.
  • ACH: a NACHA Payments module exports payments as NACHA files for use in the United States.
  • Checks: a US checks module prints payments on pre-printed check paper.
  • 1099: a 1099 Reporting module exports 1099 data for e-filing through a third party.

Whether you owe sales tax on a given product, in a given state, is a tax question we do not answer. We set the software up after your tax adviser tells you what applies. We also make no claim about industry rules such as food traceability on this page; if that is your case, our post on FSMA 204 traceability with ERP, QuickBooks and Odoo is the place to start.

Build or buy

Spreadsheets, a ready ERP, or custom software.

The honest answer depends on how unusual your process is and how much time one person spends keeping the files straight.

RouteGood whenWatch for
Better spreadsheetsOne person can still keep recipes and stock straight; an item list small enough to review by hand.Single points of failure; no audit trail; costs drift.
A ready ERP such as OdooYour flow looks like most plants in your category; you want tested features and an upgrade path.Time spent on data clean-up and training; scope creep from customising what already works.
Ready ERP plus custom modulesMostly standard flow with one or two unusual steps worth owning.Every custom module is something to maintain through upgrades.
Fully custom softwareThe process itself is your edge and no package models it.Highest cost and longest timeline; you own every feature.

If you already run NetSuite or are weighing it against Odoo, our Odoo and NetSuite comparison sets out the differences. If your data lives in an old Access file or Dynamics GP, we have written about replacing Microsoft Access and moving off Dynamics GP. For a mix of plant, warehouse and shipping needs, our logistics software page covers the distribution side.

Cost

What a manufacturing ERP project costs, and what moves the price.

We quote to scope after a short call, in writing, and we ask for the budget range you have in mind so we can propose what fits. What moves the cost is the scope, the number of integrations, who does the work and how settled the requirements are. What moves the price:

  • The number of product families and levels in your bills of materials.
  • The quality of your current data and how much clean-up it needs.
  • Whether you need work orders and shop-floor tablets, or only production orders.
  • Costing and valuation setup, and any link to your existing accounting software.
  • Custom modules and integrations: shipping, quoting, supplier portals.
  • Training before go-live.
A real figure comes after we see your products. Odoo licence fees are separate and are set by Odoo, so read the pricing guide before you budget.

To get a number for your own plant, ask for an estimate and describe your products and what goes into them. That is enough for a first scope.

Why plants pick Devvista
"An ERP project fails when the software is configured before the data is understood."

Three habits that shape how we run manufacturing projects.

01

Data first

We start with your item list and bills of materials, find the duplicates and gaps, and agree a clean-up scope before any configuration. It is the least exciting step and the one that saves the most rework.

02

One product family at a time

Rolling out a whole plant at once hides problems. We run one family end to end, from quote to invoice, then widen. You judge the system on real orders.

03

Plain statements about fit

If a spreadsheet fix, a ready ERP or a small custom module is the better answer, we say so on the first call, even when it is a smaller project for us.

How a project runs

From a first call to a plant that runs on one system.

Every step is checked on a staging copy before it touches live data.

Book a call
01
Walk through your process on a call
We follow one product from quote to shipment on a video call and list every file, system and manual step it touches. You leave with a short written summary of what we heard.
02
Clean the data
Items, units of measure, bills of materials, work centers and suppliers are cleaned and mapped. You approve the import file before anything loads.
03
Configure and demo on staging
We set up manufacturing, stock, purchasing and costing, and show progress on a staging build every one to two weeks so you catch misunderstandings early.
04
Train and run in parallel
Where it suits you, we can propose a short parallel run: your team practises on real orders while the old files stay in place, and costs and stock counts are compared between both.
05
Go live and support
We switch over on an agreed date, stay available for fixes, and can continue on a monthly support arrangement or hourly as needed.
FAQ

Questions plant owners ask before a first call.

Straight answers to the questions buyers ask before a first call.

Still have a question?Send it over and we will answer personally.Send a Message

A manufacturing ERP is one system that holds your products, bills of materials, production orders, stock, purchasing and accounting, so each department reads the same numbers. Odoo describes its Manufacturing app as a way to schedule, plan and process manufacturing orders, with tablets on the shop floor to run work orders as they happen.

It can cover the basics a small plant needs: bills of materials, work orders, work centers, stock and costing. Whether it fits your plant depends on your process. We can build a short demo from a few of your own products so you judge the fit before committing to a project.

Odoo supports three: standard cost (a fixed unit cost you update by hand), average cost (a weighted average that changes with each receipt) and FIFO (units leave at the cost of the oldest stock first). The right one depends on how your prices move and how your accountant wants stock valued, so ask your accountant first. We configure the choice; we do not give accounting advice.

Odoo has an AvaTax integration for companies located in the United States, Canada or Brazil. It needs your own Avalara account and a license key from Avalara, and by default it uses the company address rather than the warehouse address; Odoo says to enable Allow Ship Later in the Point of Sale settings to use the warehouse address. Excise taxes such as those on tobacco, vapes and fuel are not supported. Confirm your tax setup with your tax adviser.

We quote to scope after a short call, in writing, and we ask for the budget range you have in mind so we can propose what fits. What moves the cost is the scope, the number of integrations, who does the work and how settled the requirements are. A first phase for one plant is usually scoped as a fixed price after a short discovery call.

Move when the cost of disagreement is visible: late orders because material counts were wrong, quotes priced from stale costs, or one person who holds the recipe file in their head. If one person can still keep the numbers straight, a smaller fix such as a shared, locked workbook may be the better first step, and we will say so.

Either. Some plants keep their accounting system and add production on top through an integration; others move books and production into one Odoo database. Our guide to moving from QuickBooks Desktop to Odoo covers the second route. We compare both with your volumes before recommending one.

Yes. Item lists, bills of materials and work center details are imported from spreadsheets after a clean-up pass, because the import is only as good as the data in it. We agree the clean-up scope in advance; in our experience duplicate part numbers and missing units of measure take the most time.

Your data is yours, and custom modules we write for you are handed over with the project. We sign an NDA before you share recipes or pricing, and we agree hosting and licence terms in the scope.

When your process looks like most other plants in your category. A ready ERP carries years of tested features and an upgrade path. Custom code pays only when a step is truly unusual and worth owning. Often the answer is both: a ready ERP for the standard flow and a small custom module for the odd step.
Let's talk

Ready to see your products in a system that runs the whole plant?

Send us the products you make and what goes into them. We will come back with a scope, a price route and an honest view of whether Odoo fits.

  • 30-minute consultation
  • No commitment required
  • Response within 24 hours
  1. Book a call30 minutes, no pitch. Tell us what you want to build.
  2. Get a straight answerHonest feedback on fit, scope and timeline.
  3. Decide with no pressureMove ahead only if it feels right. No commitment required.
Chat on WhatsApp