Skip to main content
Have a project in mind? Let's talk
Book a call Tell us about your project Book a Call
US
  Construction, US

Certified Payroll and the WH-347: Column Guide and How to Automate the Report

What the Department of Labor requires, what every column means, where reports go wrong, and how to assemble the report from timesheets while the contractor signs.

On the call we cover
  • Your current system and what has to change
  • The deadlines and rules that apply to you
  • A step-by-step plan with timeline
  • A clear scope and cost range
Book a Call

Certified payroll is the weekly payroll report that contractors and subcontractors on Davis-Bacon covered work submit, and the WH-347 is the U.S. Department of Labor form many use for it. The Department of Labor says use of the WH-347 itself is optional, but covered contractors are required by the regulations and the contract clauses to submit payroll information weekly (DOL, Form WH-347).

This page walks through the form column by column, the mistakes that cause rejected or wrong reports, and how to assemble the report from timesheets faster. Throughout, the contractor signs the Statement of Compliance. A tool never does. It covers the US only. Canada, the UK and Australia have different systems, and this page does not describe them.

What certified payroll and the WH-347 require

Davis-Bacon applies to contractors and subcontractors on federally funded or assisted contracts in excess of $2,000 for construction, alteration or repair of public buildings or public works, and it requires locally prevailing wages and fringe benefits (DOL, Davis-Bacon and related acts). The weekly payroll requirement is in 29 CFR 5.5(a)(3)(ii).

RequirementWhat the DOL or the regulation saysSource
FrequencySubmit a certified payroll weekly, for each week in which any covered work is performed29 CFR 5.5
FormUse of Form WH-347 is optional; weekly payroll information is mandatoryDOL WH-347 page
Accompanying statementEach certified payroll must be accompanied by a signed Statement of Compliance29 CFR 5.5; DOL
Who signsThe contractor or subcontractor, or its agent who pays or supervises payment of the workersDOL WH-347 page
SubcontractorsThe prime contractor is responsible for the submission of all certified payrolls by all subcontractors29 CFR 5.5
Electronic filingAllowed with a legally valid electronic signature that includes a way to verify the signer. Scanned or photocopied signatures do not qualifyDOL WH-347 page; 29 CFR 5.5
RecordsKept during the work and for 3 years after all the work on the prime contract is completed29 CFR 5.5
Worker IDLast four digits of the Social Security number or another individual number; full numbers must not be includedDOL WH-347 page

We did not find in the sources we opened a specific number of days after payday for submission, so we do not state one. Check your contract and your contracting agency for the exact deadline and where to file.

The WH-347, column by column

The DOL's instructions describe page 1 as the payroll grid and page 2 as the Statement of Compliance. The grid has these columns (DOL WH-347 instructions):

ColumnWhat you enterWhere it goes wrong
Header fieldsProject name, certified payroll number (start at 1 and number each weekly payroll for the project), week ending dateSkipping a week number, or reporting the wrong week
1 WorkerEntry number, name and a worker identifier (last four digits of SSN or another number)Full SSN printed on a document that should not carry it
2 J or RA"J" for journeyworker or "RA" for registered apprentice, with level of progression for apprenticesAn apprentice not registered or used beyond the allowed ratio
3 Labor classificationThe classification for work actually performed, from the applicable wage determination. One row per classification if the worker did severalUsing the job title instead of the wage-determination classification
4 Hours each dayStraight time (ST) and overtime (OT) for each day, with dates. Hours over 40 in the week on this project are entered as overtime under CWHSSACounting hours on one project and ignoring the 40-hour rule
5 Total hoursSum of the column 4 hoursNot matching the daily entries
6A Hourly rate paidActual hourly rate for ST and for OT. Do not include cash in lieu of fringes hereMixing fringe cash into the base rate
6B Fringe creditTotal hours multiplied by the hourly credit from the page 2 tableClaiming credit for benefits that are not bona fide
6C Cash in lieu of fringeThe total amount in cash provided in lieu of fringe benefits to the worker during the workweekPaying less than the determination in total
7A Gross, this projectGross earned on the federal or federally assisted projectMixing in private-job hours
7B Gross, all workTotal gross for all work that week, including non-covered workLeaving it blank
8 DeductionsTax, FICA, Other and total. Itemize Other if it covers more than one deduction. Do not prorate deductionsProrating across jobs
9 Net payActual dollars paid for all hours across all projectsUsing a calculated figure instead of the real check amount

Page 2 holds the Statement of Compliance, the apprenticeship program list and the fringe benefit credit table, with a remarks area.

The Statement of Compliance: the contractor signs

The DOL says Boxes 1, 2, 3 and 6 must always be checked. Box 4 is checked only if any worker is paid as an apprentice, with each program listed. Box 5 is checked when you claim an hourly credit for bona fide fringe benefits, and its sections must then be completed (DOL WH-347 page). The signer certifies that the payroll and records are accurate and complete, that workers received their full weekly wages without improper deductions, and that they were paid at least the applicable rates for their actual classifications (29 CFR 5.5). The DOL notes the statement is subject to the penalties in 18 U.S.C. 1001.

That is why the person who signs must know the facts. A person who has not checked the numbers should not sign, and a tool cannot sign for them.

Where manual certified payroll goes wrong

Two errors are common in the sources we opened and easy to prevent:

FailureWhat the DOL saysWhy it costs money
Wrong classificationWorkers must be paid for the classification of work actually performed. If hours by classification were not kept, the worker must be paid for all hours at the highest applicable prevailing wage rate. Apprentices who are not properly registered or exceed the ratio must be paid the applicable wage rates for the work they performed, regardless of the classification listed on the payroll. (DOL WH-347 page; DOL FAQ Q13)A crew member splitting time between laborer and carpenter work, logged at the lower rate, can create underpayment owed back
Fringe benefits mishandledBona fide fringe benefits include items such as health insurance, pension, vacation and sick leave; payments required by federal, state or local law do not count as fringe benefit contributions (DOL FAQ Q29)Counting a legally required payment as a fringe credit makes the weekly total look compliant when it is not
Late or missing weeksWeekly submission is required for each week any covered work is performed (29 CFR 5.5)A subcontractor's missing payroll leaves the prime's submission incomplete, because the prime is responsible for all subcontractor payrolls
Rekeyed hoursColumn 5 must equal the daily hours in column 4Hand-copying from timesheets into a grid creates the mismatch

Most of these arise when payroll comes from timesheets and a separate wage determination that a person must read and apply by hand.

How to assemble the report from timesheets with a sign-off

This is a design, not a client result: we have not delivered it for a construction company. It assembles the report. It does not certify it.

  1. Ingest. Timesheets or time-clock exports (CSV, spreadsheet or app export) and the payroll register arrive weekly in a folder or mailbox. A workflow tool such as n8n or Make collects them for the week ending date.
  2. Map workers. Each worker is matched to a stored record: entry number, last-four identifier, journeyworker or apprentice status. The full Social Security number is never stored in the report data.
  3. Apply the wage determination. You load the applicable determination for the project (classifications, base rates and fringe rates) once. The tool matches each time entry's job code to a classification. Uncertain or missing matches go to a person.
  4. Calculate. The tool fills the grid: daily ST and OT hours, over-40 hours as OT, totals, base rate, fringe credit or cash in lieu, gross for the project and for all work, deductions and net pay from the payroll register.
  5. Run checks. It compares paid total against required total for each worker, lists classification and fringe exceptions, and shows week numbers that are missing.
  6. Draft the report and Statement of Compliance. It produces the grid and a prepared page 2 with the boxes that appear to apply, and leaves the signature blank.
  7. Human sign-off. The payroll administrator and the person who pays or supervises payment review the exceptions and numbers. The contractor signs, using a legally valid electronic signature process or a wet signature. Nothing is submitted, and nothing is signed, by the tool.
  8. Retain. The signed report, the source files and the approval record are stored together, because records must be retained for 3 years after all the work on the prime contract is completed (29 CFR 5.5).

When to use your payroll provider instead

Many payroll providers produce certified payroll reports, and construction platforms offer related tools. We did not open their documentation for this page. Use an existing payroll service if:

  • your payroll provider already generates the WH-347 or an equivalent and your people trust it,
  • you have one or two covered projects a year and few workers,
  • your contracting agency requires a specific online system for filing that you must use anyway.

Custom assembly makes sense when timesheets, job codes and the payroll register live in different systems, you carry several covered projects at once, or classification and fringe exceptions are your recurring problem. Related compliance jobs for subcontractors are covered in our subcontractor compliance tracker, certificate of insurance tracking and lien waiver tracking pages, and the document jobs of submittal logs and RFI logs. The overview is in AI automation for construction companies.

What shapes the cost and how to start

Describe the job and the budget range you have in mind in the contact form. Devvista quotes in writing after a short call. What shapes the work:

  • where timesheets and payroll data come from, and in what format,
  • how many projects, wage determinations and classifications are involved,
  • whether your contracting agency requires a particular filing system,
  • who reviews exceptions and signs.

See our AI agents and workflow automation services, and our case studies for delivered work in other fields. We do not give legal or payroll advice; ask your payroll provider or counsel about your contract.

Straight Answers.

Still have a question?Send it over and we will answer personally.Send Your Question

Certified payroll is a weekly payroll report, with a signed Statement of Compliance, that contractors and subcontractors on Davis-Bacon covered work submit. It lists each worker, classification, hours, rate, fringe benefits, gross, deductions and net pay.

The WH-347 is the U.S. Department of Labor Payroll form. The DOL says using it is optional, but covered contractors must submit payroll information weekly, and a properly completed WH-347 satisfies that requirement.

Contractors and subcontractors on federally funded or assisted construction contracts covered by Davis-Bacon, which the DOL describes as contracts in excess of $2,000. Subcontractors report through the prime contractor, who is responsible for the submission of all subcontractor payrolls.

Weekly, for each week in which covered work is performed, according to 29 CFR 5.5(a)(3)(ii) as published on Cornell LII. We did not find a number of days after the pay date in the sources we opened, so check your contract for the filing deadline.

The contractor or subcontractor, or its agent who pays or supervises payment of the workers during the week. The DOL says scanned or photocopied signatures do not qualify, and legally valid electronic signatures are accepted. A software tool cannot sign for the contractor.

The DOL says Boxes 1, 2, 3 and 6 must always be checked. Box 4 applies if any worker is paid as an apprentice, with programs listed. Box 5 applies if you claim an hourly credit for bona fide fringe benefits.

No. The DOL instructs to use the last four digits of the worker's Social Security number or another number specific to the worker, and says full Social Security numbers must not be included.

The DOL FAQ says bona fide fringe benefits include items such as health insurance, pension, vacation and sick leave, and that payments required by federal, state or local law do not count as fringe benefit contributions. Confirm your plan with a payroll specialist.

The DOL instructions say that if hours by classification were not kept, the worker must be paid for all hours worked using the highest applicable prevailing wage rate. Track classification hours daily to avoid that.

Assembling it can: reading timesheets, applying the wage determination, calculating the grid and flagging exceptions. Review and signature cannot. The contractor reviews and signs the Statement of Compliance. We have not delivered this for a construction client, and quote after a short call.

Under 29 CFR 5.5(a)(3)(ii), certified payrolls are kept during the work and for 3 years after all the work on the prime contract is completed. Check your contract for anything longer.

No. They have different systems and this page covers the US only. We have not described them here and will not guess.
United States

Describe your payroll reporting and budget range

Tell us where timesheets and payroll data live and how many covered projects you run. Devvista quotes in writing after a short call.

  • 30-minute consultation
  • No commitment required
  • Response within 24 hours
  1. Book a call30 minutes with an Odoo specialist.
  2. Get a clear planSteps, timeline and a cost range for your setup.
  3. DecideGo ahead with us, or take the plan with you.
Chat on WhatsApp